Supervision of the Removal of an Underground Storage Tank
Supervision of Roof Replacements
Roof Assessments
Level III Mould Remediation
Assessment of Asbestos-Containing Materials
Building Envelope Investigations
Supervision of Contaminated Soil Remediation
Foundation Water Proofing
Borehole Drilling as part of a Phase Two Environmental Site Assessment
Air Sampling Studies for Airborne Mould Elements
Assessment of Mould Impacted Buildings
Mould Contamination due to Building Envelope Water Infiltration
Water Sample from a Monitoring Well showing Petrolium Product at the Bottom of the Sample.
Hazerdous Materials Investigations
Type 3 Removal of Asbestos-Containing Fireproofing
Mould Remediation using Ice Blasting