Water Sample from a Monitoring Well showing Petrolium Product at the Bottom of the Sample.
Hazerdous Materials Investigations
Supervision of Contaminated Soil Remediation
Supervision of Roof Replacements
Assessment of Mould Impacted Buildings
Assessment of Asbestos-Containing Materials
Air Sampling Studies for Airborne Mould Elements
Level III Mould Remediation
Mould Remediation using Ice Blasting
Foundation Water Proofing
Roof Assessments
Supervision of the Removal of an Underground Storage Tank
Type 3 Removal of Asbestos-Containing Fireproofing
Borehole Drilling as part of a Phase Two Environmental Site Assessment
Building Envelope Investigations
Mould Contamination due to Building Envelope Water Infiltration